| Port Division | Invitation # | Title | Description | Pre-Bid/Proposal Meeting Date | Question Period Ends | Bid/Proposal Due Date | Single/Multiple Award | RFP/Bid Link |
|---|---|---|---|---|---|---|---|---|
| Program Management | HD-S3180 | Pier B On-Dock Rail Support Facility North Yard Utilities & Pier B St. Widening | The Work required by this Contract includes, but is not limited to, the following: surface and subsurface demolition; storm drainage, sewer, water, communication and electrical facilities construction; fire protection; sewer lift station construction; roadway and retaining wall construction; landscaping and irrigation; street lighting; paving; striping and signage; traffic control; fencing; erosion control; and grading. Refer to Section 01 11 00, Summary of Work in the Technical Specifications. | 10/6/26 | 12/01/26 | 12/08/26 | Single | View on Planet Bidshttps://vendors.planetbids.com/portal/19236/bo/bo-detail/144945 |
| Program Management | HD-S3203 | Harbor Fleet Zero Emissions Infrastructure | The Work required by this Contract includes, but is not limited to, the following: Construction of infrastructure and underground utilities and installation of electrical equipment to support zero emissions charging equipment and charge management systems at various Port facilities. Refer to Section 01 11 00, Summary of Work in the Technical Specifications. | 10/20/26 | 11/10/26 | 11/17/26 | Single | View on Planet Bidshttps://vendors.planetbids.com/portal/19236/bo/bo-detail/146674 |
| Environmental Planning | EP-26-04 | On-Call Professional Clean Energy and Operational Resiliency Services |
The Port’s Zero Emissions, Energy Resilient Operations (ZEERO) policy was adopted in 2023, to guide the Port’s programs in achieving its own carbon-neutral future while encouraging and leading the larger commercial maritime and goods movement industry to participate in the change that will secure a sustainable future for the global environment. More information can be found at the following link: https://polb.com/environment/zeero#zeero-overview The Port’s Environmental Planning Division is responsible for addressing the Port’s evolving clean energy needs, with a specific focus on emerging near-zero- and zero-emission technologies and their supporting infrastructure, alternative fuels, decarbonization, and power continuity planning. To support these efforts, the Port is seeking qualified consultants to provide on-call professional clean energy and operational resiliency services. |
11/12/2026 | 11/19/2026 | 12/03/2026 | Multiple | View on Planet Bidshttps://vendors.planetbids.com/portal/19236/bo/bo-detail/147698 |
| Executive Office | EX-26-03 | On-Call Strategic Media Consulting and Crisis Communication Services |
The Port operates in a highly visible and complex environment where operational, environmental, public safety, commercial, and community matters can generate significant public and media interest. Emerging issues, high-profile events, major initiatives, and emergency situations may require the Port to communicate quickly and strategically while ensuring information is timely, accurate, coordinated, and consistent. While the Port maintains internal communications capabilities, the complexity, and unpredictable nature of its communication needs may require specialized expertise and additional support beyond day-to-day communications. To address these needs, the Port is seeking qualified consultants to provide strategic media and crisis communications services on an as-needed basis. |
11/12/2026 | 11/18/2026 | 12/08/2026 | Multiple | View on Planet Bidshttps://vendors.planetbids.com/portal/19236/bo/bo-detail/147760 |
| Program Management | HD-S3215 | Pier B On-Dock Rail Support Facility Rail Yard Access Improvements | The Work required by this Contract includes, but is not limited to, the following: realignment, relocation, shifting, resurfacing, and rehabilitation of existing railroad tracks and construction of new lead tracks within the Pier B rail yard and Pico Avenue corridor, including special trackwork (turnouts and a crossover); modification of the railroad signal system at CP Gaspur; demolition and removal of existing tracks, pavement, utilities, and structures, including removal of abandoned third-party utilities; earthwork, grading, subgrade preparation, and soil disposal; storm drain and underdrain improvements; utility protection, including a casing extension for water line protection and protection of the LACSD trunk sewer; relocation of street lighting; fencing; and traffic control, with the Work phased around active railroad operations. Refer to Section 01 11 00, Summary of Work in the Technical Specifications. | 11/16/2026 | 12/08/2026 | 12/15/2026 | Single | View on Planet Bidshttps://vendors.planetbids.com/portal/19236/bo/bo-detail/147471 |
| Port Planning | PL-26-04 | On-Call Professional Economic Consulting Services |
The Port of Long Beach (Port) is seeking qualified consultant(s) to provide professional economic consulting services. The scope of services includes but is not limited to the following tasks: 1. Monitoring and Analysis of Cargo Demand 2. Economic Impact Modeling 3. Cost-Benefit Analysis 4. Trade Policy Impacts on Cargo Demand Analysis 5. Industrial Policy Impacts on Cargo Demand Analysis 6. Transportation and Port Industry Trend Analysis 7. Workforce Development Analysis 8. Cargo Flow and Inland Distribution Analysis 9. Reports and Presentations on All Items Above The Port expects to award more than one contract from this procurement. |
11/18/2026 | 11/25/2026 | 12/10/2026 | Multiple | View on Planet Bidshttps://vendors.planetbids.com/portal/19236/bo/bo-detail/147907 |
| Program Management | HD-S3262 | On-Call Services for Underground Wet Utilities | The Work required by this contract includes, but is not limited to, the following: On an on-call basis, closed circuit television inspections (CCTV) of pipelines; cleaning of sewer and storm drain pipelines; repairs of water, sewer, storm drain, fuel and natural gas pipelines; other wet utility appurtenances repair and construction; wet utility pipeline removal and reconstruction; and/or cured-in-place pipe construction; Vactor truck, and hydro jetting operations. Refer to Technical Specification 01 11 00 “Summary of Work". | 12/08/2026 | 12/15/2026 | Single | View on Planet Bidshttps://vendors.planetbids.com/portal/19236/bo/bo-detail/147716# |